1. Home
  2. Policy & Regulation
  3. Petition for approval of tariff of the Rihand Super Thermal Power Station-II (1000 MW) for the period from 1.4.2019 to 31.3.2024.NTPC Limited – EQ Mag Pro
Petition for approval of tariff of the Rihand Super Thermal Power Station-II (1000 MW) for the period from 1.4.2019 to 31.3.2024.NTPC Limited – EQ Mag Pro

Petition for approval of tariff of the Rihand Super Thermal Power Station-II (1000 MW) for the period from 1.4.2019 to 31.3.2024.NTPC Limited – EQ Mag Pro

0
0
Anand Gupta Editor - EQ Int'l Media Network