Petition for approval of the revised Bye-Laws, Rules & Business Rules of IEX in compliance with the provisions of CERC (Power Market) Regulations, 2021 – EQ Mag Pro
0
0
Petition for approval of the revised Bye-Laws, Rules & Business Rules of IEX in compliance with the provisions of CERC (Power Market) Regulations, 2021.
For more information please see below link:
Related posts:
- Petition For Approval of Introduction of the Green Day Ahead Contract in Day Ahead Market Segment at IEX
- Petition for approval of introduction of the Hydropower Contracts in Green Term-Ahead Market (GTAM) at Indian Energy Exchange Limited – EQ Mag Pro
- Petition For determination of transmission tariff of the 2019-24 tariff period for two assets under “Transmission system” – EQ Mag Pro
- Petition for adoption of usage charges for 1,692 MW Solar Photovoltaic (PV) Power Station (Tranche-I & II) connected to the Inter-State Transmission System – EQ Mag Pro