![Petition For Approval of the Tariff of Bongaigaon Thermal Power Station (750 MW) For the Period From COD of Unit-1](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition For Approval of the Tariff of Bongaigaon Thermal Power Station (750 MW) For the Period From COD of Unit-1
0
0
Petition For Approval of the Tariff of Bongaigaon Thermal Power Station (750 MW) For the Period From COD of Unit-1.
For more information please see below link:
Related posts:
- CERC Adopted Individual Tariff for 3 GW of the Power Projects
- Petition For Truing Up of Tariff For 1200 MW Dgen Mega Power Project of Torrent Power Limited
- Petition For Review of Commission’s Order For Determination of the Tariff For Muzaffarpur Thermal Power Station
- Petition For Determination of Tariff of 1200 MW Coal Based Power Project at Odisha