![Petition for Determination of Feed in Tariff for procurement of power from small capacity Grid connected solar PV power projects – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2020/03/UPERC-seeking-withdrawl-of-huge-liabilities-wrongfully-imposed-on-petitioner-for-five-months-and-two-days.jpg)
Petition for Determination of Feed in Tariff for procurement of power from small capacity Grid connected solar PV power projects – EQ Mag Pro
0
0
Petition for Determination of Feed in Tariff for procurement of power from small capacity Grid connected solar PV power projects.
For more information please see below link:
Related posts:
- Petition For Approval of Truing Up of Tariff for the control period FY 2014-15 to FY 2018-19 – EQ Mag Pro
- Petition of PPA between M/S T A Grrrentech and UPPCL for seeking approval of Change in Law events due to promulgation of GST Laws and safeguard duty – EQ Mag Pro
- Petition for Truing Up for FY 2020-21 , APR for FY 2021-22 and Approval of ARR for FY 2022-23 – Of DVVNL, MVVNL, PVVNL, PUVVNL, KESCO – EQ Mag Pro
- Petition for Seeking relief on account of a Change in Law viz. the introduction of Goods and Services Tax laws at the Central level and change in the rate of Service Tax – EQ Mag Pro