Petition for determination of Nabinagar Thermal Power Project (1000 MW) for the period from 1.4.2019 to 31.3.2024. Bhartiya Rail Bijlee Company Ltd – EQ Mag
0
0
Petition for determination of Nabinagar Thermal Power Project (1000 MW) for the period from 1.4.2019 to 31.3.2024. Bhartiya Rail Bijlee Company Ltd.
For more information please see below link:
Related posts:
- Petition for revision of tariff of Simhadri Super Thermal Power Station, Stage-II (1000 MW) for the 2014-19 tariff period – EQ Mag Pro
- Petition for truing up of transmission tariff of the 2014-19 tariff period and determination of transmission tariff of the 2019-24 tariff period – EQ Mag Pro
- Petition for approval of tariff of the Rihand Super Thermal Power Station-II (1000 MW) for the period from 1.4.2019 to 31.3.2024.NTPC Limited – EQ Mag Pro
- Petition for revision of tariff of Mauda Super Thermal Power Station-I (1000 MW) NTPC – EQ Mag Pro
tags:
1000 MW Bhartiya Rail Bijlee Company Ltd CERC determination of Nabinagar Thermal Power Project Petition