1. Home
  2. Policy & Regulation
  3. Petition – For determination of project specific levelised tariff for 92 MW floating solar Photo Voltaic Plants at RGCCP, Kerala
Petition – For determination of project specific levelised tariff for 92 MW floating solar Photo Voltaic Plants at RGCCP, Kerala

Petition – For determination of project specific levelised tariff for 92 MW floating solar Photo Voltaic Plants at RGCCP, Kerala

0
0

 

Petition under Section 62 and 79 (1) (a) of the Electricity Act, 2003 read with CERC (Conduct of Business) Regulation, 1999
along with CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017, for determination of project specific levelised tariff for 92 MW floating solar Photo Voltaic Plants in two phases (first phase 22MW and second phase 70 MW) at Rajiv Gandhi Combined Cycle Power Project (RGCCP), Kayamkulam, Kerala

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *