Petition for Determination of Project Specific Levellized Tariff for 200 kW Solar Power Projects set up by the Petitioner at Khatkar Kalan, Nawanshar – EQ Mag Pro
0
0
Petition for Determination of Project Specific Levellized Tariff for 200 kW Solar Power Projects set up by the Petitioner at Khatkar Kalan, Nawanshar.
For more information please see below link:
Related posts:
- PSERC Adjourns Hearing on PSPCL Petition Seeking 300 MW Solar Power
- Petition For Seeking Issuance of Correct Energy Accounts By Punjab State Load Despatch Centre (SLDC) As Per Its Declared Availability And Payment of Capacity Charges By PSPCL
- Petition for seeking approval of procurement of 30 MW solar power on long term basis under the PSA and for procurement of wind power of 150 MW under the PSA – EQ Mag Pro
- Filing of Petition for approval of Annual Fixed Cost for 100 MW Malana-II Hydro-Electric Project for Multi Year Tariff (MYT) Control Period (FY 2017-18 to FY 2019-20) for True up of FY 2019-20 – EQ Mag Pro