Petition for determination of project specific tariff for 100 MW AC) / 155.02 Mw (DC) Solar PV power plant with 40/120 MWh of battery storage at Rajnandgao, Chhattisgarh – EQ
0
0
Petition for determination of project specific tariff for 100 MW AC) / 155.02 Mw (DC) Solar PV power plant with 40/120 MWh of battery storage at Rajnandgao, Chhattisgarh
For more information please see below link:
Related posts:
- Petition For Truing up of Transmission Tariff of 2014-19 And Determination of Transmission Tariff of 2019-24 For Nineteen Transmission Assets
- PGCIL has filed the instant petition for truing up of the capital expenditure of the 2014-19 tariff period and for determination of transmission tariff for the period from 1.4.2019 to 31.3.2024 under the CERC – EQ Mag Pro
- In the matter of Petition for grant of an inter-State trading licence in electricity – EQ Mag Pro
- Petition of PPA executed by the RSEKPL and NTPC Limited seeking relief on account of Changes in Law – EQ