1. Home
  2. Policy & Regulation
  3. Petition for Determination of Tariff for Control Period 2024 to 2029 for the 330 MW (4 x 82.5 MW) Shrinagar Hydro Electric Project under the PPA – EQ
Petition for Determination of Tariff for Control Period 2024 to 2029 for the 330 MW (4 x 82.5 MW) Shrinagar Hydro Electric Project under the PPA – EQ

Petition for Determination of Tariff for Control Period 2024 to 2029 for the 330 MW (4 x 82.5 MW) Shrinagar Hydro Electric Project under the PPA – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network