Petition for determination of tariff for the 2019-24 tariff period in respect of the Kahalgaon Super Thermal Power Station, Stage-II (1500 MW). NTPC Limited.
For more information please see below link:
Related posts:
- Petition for truing-up of tariff of Kahalgaon Super Thermal Power Station, Stage-II (1500 MW) for the period from 1.4.2014 to 31.3.2019. NTPC Limited – EQ Mag Pro
- Petition for approval of tariff of Korba STPS Stage-I & Stage-II (2100 MW) for the period from 1.4.2019 to 31.3.2024. NTPC Limited – EQ Mag Pro
- Petition for revision of tariff of Loktak Hydroelectric Power Station (105 MW) NTPC Limited – EQ Mag Pro
- Petition for determination of project specific levelised tariff for 92 MW floating solar Photo Voltaic Plants in two phases (first phase 22 MW and second phase 70 MW) – EQ Mag Pro