Petition for determination of tariff in respect of Teesta Low Dam Power station
0
0
Petition for determination of tariff in respect of Teesta Low Dam Power station, Stage-IV for the period from 11.3.2016 (COD of first unit) to 31.3.2019
For more information please see below link:
Related posts:
- In the matter of: Petition for approval of transmission charges, transmission losses and other conditions
- Petition for revision of tariff of SUGEN Power Plant (1147.5 MW) for the period from 1.4.2014 to 31.3.2019 after truing-up exercise
- In the matter of: Approval of tariff of Feroze Gandhi Unchahar Thermal Power Station, Stage- IV (500 MW)
- Petition of the CERC for clarification and modification of the GST/Safeguard Duty Orders