Petition for determination of tariff in respect of the Bairasiul Power Station (180 MW). NHPC India Limited (NHPC) – EQ Mag Pro
0
0
Petition for determination of tariff in respect of the Bairasiul Power Station (180 MW). NHPC India Limited (NHPC).
For more information please see below link:
Related posts:
- NHPC Issue Petition For Seeking Permission of the Commission For Injection of Infirm Power Into the Grid Up to 31.3.2023
- Petition for approval of tariff in deviation from norms specified by CERC (Terms and Condition of Tariff) Regulations, 2019 – EQ Mag Pro
- Petition for revision of tariff for the 2014-19 tariff period and determination of tariff for the 2019-24 tariff period in respect of Dhauliganga Power Station (280 MW). NHPC Limited – EQ Mag Pro
- Petition for inter alia seeking extension of Scheduled Commissioning Date for 45.6 MW out of the total 250 MW wind power project on account of Force Majeure events – EQ Mag Pro