1. Home
  2. Policy & Regulation
  3. Petition for determination of tariff of 1200 MW coal-based power project of Jindal India Thermal Power Limited for the period from 12.2.2015 to 31.3.2019 – EQ Mag Pro
Petition for determination of tariff of 1200 MW coal-based power project of Jindal India Thermal Power Limited for the period from 12.2.2015 to 31.3.2019 – EQ Mag Pro

Petition for determination of tariff of 1200 MW coal-based power project of Jindal India Thermal Power Limited for the period from 12.2.2015 to 31.3.2019 – EQ Mag Pro

0
0
Anand Gupta Editor - EQ Int'l Media Network