Petition for determination of tariff of Bhilai Expansion Power Plant (500 MW) NTPC-SAIL Power Company Limited – EQ Mag Pro
0
0
Petition for determination of tariff of Bhilai Expansion Power Plant (500 MW) NTPC-SAIL Power Company Limited.
For more information please see below link:
Related posts:
- Petition for revision of tariff of Bhilai Expansion Power Plant (500 MW) NTPC-SAIL Power Company Limited – EQ Mag Pro
- Petition for determination of tariff in respect of the Bairasiul Power Station (180 MW). NHPC India Limited (NHPC) – EQ Mag Pro
- Petition for determination of Generation Tariff for the period 01.04.2019 to 31.03.2024 and Truing-Up of Generation Tariff from 01.04.2014 to 31.03.2019 in respect of 262.5 MW gross capacity sale – EQ Mag Pro
- Petition for Transmission system for Ultra Mega Solar Power Park at Tumkur (Pavgada), Karnataka – Phase II (Part B)” in Southern Region. PGCIL – EQ Mag Pro
tags:
Bhilai Expansion Power Plant ( CERC determination of tariff NTPC-SAIL Power Company Limited Petition