![Petition for determination of tariff of combined cycle gas based Palatana Power Project of ONGC Tripura Power Company Limited (726.6 MW) for the 2019-24 tariff period OTPC Limited – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for determination of tariff of combined cycle gas based Palatana Power Project of ONGC Tripura Power Company Limited (726.6 MW) for the 2019-24 tariff period OTPC Limited – EQ Mag Pro
0
0
Petition for determination of tariff of combined cycle gas based Palatana Power Project of ONGC Tripura Power Company Limited (726.6 MW) for the 2019-24 tariff period OTPC Limited.
For more information please see below link:
Related posts:
- Petition for truing-up of tariff of combined cycle gas based Palatana Power Project of ONGC Tripura Power Company Limited (726.6 MW) for the 2014-19 tariff period – EQ Mag Pro
- Petition For Adoption of Tariff For Inter-State Transmission System Connected 1200 MW
- Petition For Truing Up of Tariff For 2014-19 And Determination of Tariff For 2019-24 of Dulhasti Hydroelectric Power Station (390 MW)
- Petition for revision of tariff of Dadri Gas Power Station (829.78 MW) – EQ Mag Pro