Petition for determination of tariff of Solapur STPS (1320 MW) for the period from 1.4.2019 to 31.3.2024 NTPC Limited – EQ
0
0
Petition for determination of tariff of Solapur STPS (1320 MW) for the period from 1.4.2019 to 31.3.2024 NTPC Limited
For more information please see below link:
Related posts:
- Petition for approval of tariff for the period from 30.9.2019 to 31.3.2024 for Khargone Super Thermal Power Station (1320 MW) – EQ Mag Pro
- Petition for approval of tariff of Korba STPS Stage-I & Stage-II (2100 MW) for the period from 1.4.2019 to 31.3.2024. NTPC Limited – EQ Mag Pro
- Petition for revision of tariff of Loktak Hydroelectric Power Station (105 MW) NTPC Limited – EQ Mag Pro
- Petition for revision of tariff for the period 2014-19 after truing up exercise in respect of Ramagundam Super Thermal Power Station, Stage I & II – EQ Mag Pro