Petition for determination of tariff of Talcher Thermal Power Station (460MW) for the period from 1.4.2019 to 31.3.2024. NTPC Ltd. – EQ
0
0
Petition for determination of tariff of Talcher Thermal Power Station (460MW) for the period from 1.4.2019 to 31.3.2024. NTPC Ltd.
For more information please see below link:
Related posts:
- Petition for determination of tariff of Tanda STPS, Stage-II (1320 MW) NTPC – EQ Mag
- Petition for recovery of Additional Expenditure incurred due to ash transportation charges consequent to Ministry of Environment, Forest & Climate Change, Government of India – EQ Mag Pro
- Petition for determination of tariff for the 2019-24 tariff period in respect of the Kahalgaon Super Thermal Power Station, Stage-II (1500 MW). NTPC Limited – EQ Mag
- Petition for truing up of annual fixed charges for the period 2014-19 and for determination of tariff for the period 2019-24 in respect of Maithon Hydel Power Station, Units-I to III (63.2 MW) DVC – EQ Mag