Petition for determination of tariff on installation of various Emission Control Systems at National Capital Thermal Power Station (NCTPS), Dadri Stage-I (840MW) – EQ
0
0
Petition for determination of tariff on installation of various Emission Control Systems at National Capital Thermal Power Station (NCTPS), Dadri Stage-I (840MW)
For more information please see below link:
Related posts:
- Petition for recovery of Additional Expenditure incurred due to ash transportation charges consequent to Ministry of Environment, Forest & Climate Change, Government of India – EQ Mag Pro
- Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of Feroze Gandhi Unchahar Thermal Power Station Stage-IV (500 MW) NTPC Limited – EQ Mag Pro
- Petition for determination of tariff for the 2019-24 tariff period in respect of the Kahalgaon Super Thermal Power Station, Stage-II (1500 MW). NTPC Limited – EQ Mag
- Petition for approval of tariff of Lara Super Thermal Station (1600 MW) NTPC Limited – EQ Mag