Petition for determination of tariff on installation of various Emission Control Systems at NCTPS, Dadri Stage-II (980MW) in compliance of Revised Emission Standard NTPC – EQ
0
0
Petition for determination of tariff on installation of various Emission Control Systems at NCTPS, Dadri Stage-II (980MW) in compliance of Revised Emission Standard
For more information please see below link:
Related posts:
- Petition for determination of tariff of Bhilai Expansion Power Plant (500 MW) NTPC-SAIL Power Company Limited – EQ Mag Pro
- Petition for determination of tariff for the year 2020-21 to 2023-24 in respect of RVPNL-owned transmission lines/system connecting with other States and Intervening transmission lines – EQ Mag
- Petition determination of tariff for the 2019-24 tariff period for Bhadrawati (Chandrapur) HVDC backto-back station (2×500 MW) in Southern Region and Western Region – EQ Mag
- Petition for determination of tariff of Tanda STPS, Stage-II (1320 MW) NTPC – EQ Mag