![Petition for determination of tariff on installation of various Emission Control Systems at NCTPS, Dadri Stage-II (980MW) NTPC Limited – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for determination of tariff on installation of various Emission Control Systems at NCTPS, Dadri Stage-II (980MW) NTPC Limited – EQ Mag
0
0
Petition for determination of tariff on installation of various Emission Control Systems at NCTPS, Dadri Stage-II (980MW) NTPC Limited
For more information please see below link:
Related posts:
- Petition for determination of tariff in respect of the Bairasiul Power Station (180 MW). NHPC India Limited (NHPC) – EQ Mag Pro
- Petition for determination of tariff of Bhilai Expansion Power Plant (500 MW) NTPC-SAIL Power Company Limited – EQ Mag Pro
- Petition for determination of tariff of Tanda STPS, Stage-II (1320 MW) NTPC – EQ Mag