![Petition for determination of tariff on installation of various Emission Control Systems in MTPS (1000 MW) of DVC – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for determination of tariff on installation of various Emission Control Systems in MTPS (1000 MW) of DVC – EQ
0
0
Petition for determination of tariff on installation of various Emission Control Systems in MTPS (1000 MW) of DVC
For more information please see below link:
Related posts:
- Petition for revision of tariff for the 2014-19 tariff period after truing up exercise in respect of Bokaro Thermal Power Station Unit-1 to 3 (630 MW) and determination of tariff for the 2019-24 tariff period – EQ Mag
- Petition for seeking approval of the secondary supplementary PPA executed between Maithon Power Limited and DVC – EQ Mag
- Petition for truing up tariff for the period 2014-19 in respect of Chandrapura Thermal Power Station, Unit Nos. I to III (390 MW) and for determination of tariff for the period 2019-24 – EQ Mag
- Petition (“Change in Law”) of the PPA executed between M/s Uttam Sugar Mills Ltd. and Uttarakhand Power Corporation Ltd – EQ Mag Pro