
Petition for determination of tariff on installation of various Emission Control Systems in MTPS (1000 MW) of DVC in compliance of Revised Emission Standards – EQ
0
0
Petition for determination of tariff on installation of various Emission Control Systems in MTPS (1000 MW) of DVC in compliance of Revised Emission Standards
For more information please see below link:
Related posts:
- Petition for revision of tariff for the 2014-19 tariff period after truing up exercise in respect of Bokaro Thermal Power Station Unit-1 to 3 (630 MW) and determination of tariff for the 2019-24 tariff period – EQ Mag
- Petition for seeking approval of the secondary supplementary PPA executed between Maithon Power Limited and DVC – EQ Mag
- Petition for truing up tariff for the period 2014-19 in respect of Chandrapura Thermal Power Station, Unit Nos. I to III (390 MW) and for determination of tariff for the period 2019-24 – EQ Mag
- Petition for Adoption of Tariff discovered through Competitive Bidding Process for selection of solar power developers for setting up of 500 MW ISTS-connected Solar PV Power projects in India