Petition for determination of tariff on installation of various Emission Control Systems in MTPS Units 7&8 (1000 MW) of DVC in compliance of Revised Emission Standards – EQ
0
0
Petition for determination of tariff on installation of various Emission Control Systems in MTPS Units 7&8 (1000 MW) of DVC in compliance of Revised Emission Standards
For more information please see below link:
Related posts:
- Petition for determination of tariff in respect of the Bairasiul Power Station (180 MW). NHPC India Limited (NHPC) – EQ Mag Pro
- Petition for determination of tariff of Talcher Thermal Power Station (460MW) for the period from 1.4.2019 to 31.3.2024. NTPC Ltd. – EQ
- Petition for determination of tariff of Agartala Gas Turbine Combined Cycle Power Plant (135 MW) of North Eastern Electric Power Corporation Limited – EQ
- Petition for truing-up of tariff for the period 2014-19 and for determination of tariff for the period 2019-24 in respect of Uri-II Hydroelectric Project (240 MW). NHPC Limited – EQ