Petition for determination of tariff on the installation of various Emission Control Systems in Bokaro-A Thermal Power Station (1×500 MW) of Damodar Valley Corporation (DVC) – EQ
0
0
Petition for determination of tariff on the installation of various Emission Control Systems in Bokaro-A Thermal Power Station (1×500 MW) of Damodar Valley Corporation (DVC)
For more information please see below link:
Related posts:
- Petition for determination of tariff for the inter-state transmission lines of the HVPNL for 2015-16 to 2018-19 – EQ Mag
- Petition for determination of tariff on installation of various Emission Control Systems at NCTPS, Dadri Stage-II (980MW) NTPC Limited – EQ Mag
- Petition for determination of tariff of Talcher Thermal Power Station (460MW) for the period from 1.4.2019 to 31.3.2024. NTPC Ltd. – EQ
- Petition for determination of tariff on installation of various Emission Control Systems at NCTPS, Dadri Stage-II (980MW) in compliance of Revised Emission Standard NTPC – EQ