Petition for determination of transmission tariff for the 2019-24 tariff period in respect of three number transmission assets under “Transmission System associated with DGEN TPS (1200 MW) of Torrent Power Limited”. PGCIL – EQ
0
0
Petition for determination of transmission tariff for the 2019-24 tariff period in respect of three number transmission assets under “Transmission System associated with DGEN TPS (1200 MW) of Torrent Power Limited”. PGCIL
For more information please see below link:
Related posts:
- PGCIL has filed the instant petition for truing up of the capital expenditure of the 2014-19 tariff period and for determination of transmission tariff for the period from 1.4.2019 to 31.3.2024 under the CERC – EQ Mag Pro
- Petition for determination of tariff for the year 2020-21 to 2023-24 in respect of RVPNL-owned transmission lines/system connecting with other States and Intervening transmission lines – EQ Mag
- Petition for seeking directions from this Commission to PGCIL to extend the long term access start date and extend the deadline from completion of the dedicated transmission line – EQ Mag
- Petition seeking release of Bank Guarantee issued in favour of Respondent No. 1 owing to frustration of the Long-Term Access Agreement between the Petitioner No. 1 and Respondent No – EQ Mag