1. Home
  2. Policy & Regulation
  3. Petition for determination of transmission tariff for the 2019-24 tariff period in respect of three number transmission assets under “Transmission System associated with DGEN TPS (1200 MW) of Torrent Power Limited”. PGCIL – EQ
Petition for determination of transmission tariff for the 2019-24 tariff period in respect of three number transmission assets under “Transmission System associated with DGEN TPS (1200 MW) of Torrent Power Limited”. PGCIL – EQ

Petition for determination of transmission tariff for the 2019-24 tariff period in respect of three number transmission assets under “Transmission System associated with DGEN TPS (1200 MW) of Torrent Power Limited”. PGCIL – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network