![Petition for determination of transmission tariff of the assets covered under Transmission System for Ultra Mega Solar Power Park at Tumkur](https://www.eqmagpro.com/wp-content/uploads/2020/02/Petition-for-determination-of-transmission-tariff-of-the-assets-covered-under-Transmission-System-for-Ultra-Mega-Solar-Power-Park-at-Tumkur-.jpg)
Petition for determination of transmission tariff of the assets covered under Transmission System for Ultra Mega Solar Power Park at Tumkur
0
0
Petition for determination of transmission tariff of the assets covered under Transmission System for Ultra Mega Solar Power Park at Tumkur (Pavgada), Karnataka–Phase-II (Part A).
For more information please see below link:
Related posts:
- APERC Approved Amended PPA for 6.5 MW of Wind Power Projects
- In the matter of: Determination of Transmission Tariff from DOCO
- In the matter of: Petition for adoption of tariff for inter-State Transmission System connected 600 MW Solar PV Power Projects
- In the matter of Charging Infrastructure, Tariff and other regulatory issues for Electric Vehicles
tags:
tariff