Petition for enforcement of ‘must run’ status granted to solar and wind generators
0
0
Petition invoking Regulation 1.5(i) read with Regulation 5.2(u) and Regulation 6.5(11) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 for enforcement of ‘must run’ status granted to solar and wind generators and Regulation 111 of Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 seeking direction to State Load Despatch Centre to act in accordance with IEGC provisions while issuing backing down instructions to the solar and wind generators. Southern Regional Load Despatch Centre (SRLDC)
For more information please see below link:
Related posts:
- Flexibility in Generation and Scheduling of Thermal Power Stations to reduce emissions
- Determination of levelized tariff rates for Waste to Energy (WtE) projects as well as other RE projects
- Petition for determination of project specific tariff in respect of NLC Solar Power Station I (20 MW) – 2X10 MW (AC) solar PV power projects
- Petition for approval of ARR & Tariff Petition filed by APDHPD for FY 2020-21