Petition for enforcement of ‘must run’ status granted to solar power project
0
0
Petition for enforcement of ‘must run’ status granted to solar power project
For more information click on below link :
Related posts:
- Petitioner is entitled to only reduced tariff of Rs.4.36 per unit for the energy injected into the Grid from the Solar Power Project
- Seeking extension of time for the commercial operation of the Solar Power project
- BTN Solar to issue appropriate direction to the respondent complete construction of requisite infrastructure beyond the Delivery Point required for evacuation of the entire contracted capacity of 100 MWs
- RERC:Petition filed for determination of Additional Surcharge under Section 42 (4) of the Electricity Act, 2003.