Petition for Grant of Connectivity to Projects based on Renewable Sources to Inter-State Transmission System seeking relaxation of time period – EQ Mag Pro
0
0
Petition for Grant of Connectivity to Projects based on Renewable Sources to Inter-State Transmission System seeking relaxation of time period.
For more information please see below link:
Related posts:
- Petition For seeking relaxation of the procedure set out under of Detailed Procedure for “Grant of Connectivity to Projects Based on Renewable Sources to Inter-State Transmission System – EQ Mag Pro
- Petition for connectivity to the ISTS (inter-State transmission system) for a quantum of 500 MW, as a “bulk consumer” located at Moti Khavdi, Jamnagar, Gujarat – EQ Mag Pro
- Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected to Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro
- Petition for seeking relaxation of the procedure set out of Detailed Procedure for “Grant of Connectivity to Projects Based on Renewable Sources to Inter-State Transmission System” – EQ Mag Pro