Petition For Inter Alia Seeking Extension/Deferment of Scheduled Commissioning Date For 45.6 MW Out of the Total 250 MW Wind Power Project.
For more information please see below link:
Related posts:
- Petition in The Matter For Approval of PSA for 100 MW Wind Power with SECI on Long Term Basis
- Petition For Truing Up of Transmission Tariff of 2014-19 And Determination of Transmission Tariff of 2019-24 For Two Nos. of Assets
- Petition of the PPA Entered Into Between SECI And PSPL Seeking Directions to SECI to Act in Accordance With Article 11 of the PPA