Petition for revision of tariff of Sipat Super Thermal Power Station Stage-II (1000 MW) NTPC Limited – EQ Mag Pro
0
0
Petition for revision of tariff of Sipat Super Thermal Power Station Stage-II (1000 MW) NTPC Limited.
For more information please see below link:
Related posts:
- Petition for revision of tariff of Kawas Gas Power Station (656.20 MW) for the 2014-19 tariff period, after the truing up NTPC Limited – EQ Mag Pro
- Petition for revision of tariff for the 2014-19 tariff period after truing up exercise and determination of tariff for the 2019-24 tariff in respect of Bokaro ‘A’ Thermal Power Station
- Petition for revision of tariff of Doyang Hydro Electric Power plant (75 MW) of North Eastern Electric Power Corporation Limited – EQ Mag Pro
- Petition for revision of tariff for the 2014-19 tariff period and determination of tariff for the 2019-24 tariff period in respect of Dulhasti Power Station (390 MW). NHPC Limited – EQ Mag Pro