Petition for revision of tariff of Talcher Super Thermal Power Station, Stage-II (2000 MW) – EQ Mag Pro
0
0
Petition for revision of tariff of Talcher Super Thermal Power Station, Stage-II (2000 MW).
For more information please see below link:
Related posts:
- CERC Adopted Individual Tariff for 3 GW of the Power Projects
- Petition for approval of tariff of Ramagundam Super Thermal Power Station Stage-III (500 MW) – EQ Mag Pro
- Petition for adoption of tariff discovered through Competitive Bidding Process for procurement of power from 190 MW Grid Connected Solar PV Power Project at Nokh Solar Park – EQ Mag Pro
- Petition for revision of tariff of Simhadri Super Thermal Power Station, Stage-II (1000 MW) for the 2014-19 tariff period – EQ Mag Pro