1. Home
  2. Policy & Regulation
  3. Petition for revision of tariff of Talcher Thermal Power Station (460 MW) after the truing up exercise for the period from 1.4.2014 to 31.3.2019. NTPC Ltd – EQ
Petition for revision of tariff of Talcher Thermal Power Station (460 MW) after the truing up exercise for the period from 1.4.2014 to 31.3.2019. NTPC Ltd – EQ

Petition for revision of tariff of Talcher Thermal Power Station (460 MW) after the truing up exercise for the period from 1.4.2014 to 31.3.2019. NTPC Ltd – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network