Petition for revision of tariff of Tehri Hydroelectric Power Project, Stage-I (1000 MW) THDC India Limited – EQ Mag Pro
0
0
Petition for revision of tariff of Tehri Hydroelectric Power Project, Stage-I (1000 MW) THDC India Limited.
For more information please see below link:
Related posts:
- Petition for revision of tariff of Vindhyachal Super Thermal Power Station, Stage-I (1260 MW) for the period from 1.4.2014 to 31.3.2019 – EQ Mag Pro
- Petition for revision of tariff for the 2014-19 tariff period after truing up exercise and determination of tariff for the 2019-24 tariff in respect of Tilaiya Hydel Station Unit No. 1 to 2 (2×2 MW) – EQ Mag Pro
- Petition for revision of tariff of Kawas Gas Power Station (656.20 MW) for the 2014-19 tariff period, after the truing up NTPC Limited – EQ Mag Pro
- Petition for revision of tariff of Loktak Hydroelectric Power Station (105 MW) NTPC Limited – EQ Mag Pro