![Petition for seeking appropriate directions administering applications filed by Renewable Power Park Developers applying for Connectivity under GNA Regulations – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for seeking appropriate directions administering applications filed by Renewable Power Park Developers applying for Connectivity under GNA Regulations – EQ
0
0
Petition for seeking appropriate directions administering applications filed by Renewable Power Park Developers applying for Connectivity under GNA Regulations
For more information please see below link:
Related posts:
- Petition for approval of the Transaction Fee of the Indian Energy Exchange in compliance with the provisions of CERC (Power Market) Regulations, 2021. IEX – EQ Mag Pro
- Petition of PPA executed between JSW Renew Energy Limited and Solar Energy Corporation of India Limited – EQ Mag
- Petition for determination of tariff on installation of various Emission Control Systems in MTPS (1000 MW) of DVC – EQ
- Petition for determination of tariff of Rihand Super Thermal Power Station Stage-I (1000 MW) for the period 2019-24. NTPC Limited – EQ