Petition for seeking directions in respect of the Connectivity Bank Guarantee submitted by the Petitioner for setting up a 175 MW power plant in Bellary District – EQ Mag Pro
0
0
Petition for seeking directions in respect of the Connectivity Bank Guarantee submitted by the Petitioner for setting up a 175 MW power plant in Bellary District.
For more information please see below link:
Related posts:
- Petition for revision of tariff of Dadri Gas Power Station (829.78 MW) – EQ Mag Pro
- Petition for directions to the Respondents, National Load Despatch Centre, the Central Agency and Odisha Renewable Energy Development Agency, the State Nodal Agency for the accreditation and registration of the Petitioner under the REC mechanism and consequent reliefs – EQ Mag Pro
- Petition for resolution of disputes regarding payment of capacity charges for the allocated capacity of Muzaffarpur Thermal Power Station, Stage-II (390 MW) – EQ Mag Pro