Petition For seeking extension of time for interchange of power of Unit-I (660 MW) of Barh Super Thermal Power Station, Stage-I (3X660 MW) – EQ Mag Pro
0
0
Petition For seeking extension of time for interchange of power of Unit-I (660 MW) of Barh Super Thermal Power Station, Stage-I (3X660 MW).
For more information please see below link:
Related posts:
- CERC Adopted Individual Tariff for 3 GW of the Power Projects
- Petition For Seeking Adjudication of Disputes With NTPC Limited And Northern Regional Load Despatch Centre
- Rajasthan DISCOMs Directed to Pay ₹31.34 Crores to NTPC VVN After Trading Margin Dispute
- Petition For Review of Commission’s Order For Determination of the Tariff For Muzaffarpur Thermal Power Station