![Petition for seeking permission to allow drawal of start-up power for Unit-I (800 MW) of Telangana Ph-I (1600 MW) from the grid – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for seeking permission to allow drawal of start-up power for Unit-I (800 MW) of Telangana Ph-I (1600 MW) from the grid – EQ Mag Pro
0
0
Petition for seeking permission to allow drawal of start-up power for Unit-I (800 MW) of Telangana Ph-I (1600 MW) from the grid.
For more information please see below link:
Related posts:
- Petition for seeking permission to allow drawal of start-up power for Unit-I (800 MW) of Telangana Ph-I (2X800 MW) from the grid – EQ Mag Pro
- Petition for adoption of tariff discovered through Competitive Bidding Process for procurement of power from 190 MW Grid Connected Solar PV Power Project at Nokh Solar Park – EQ Mag Pro
- Petition of PPA executed by the Petitioner and NTPC Limited seeking relief on account of a ‘Change in Law’ viz. the introduction of Goods and Services Tax laws at the Central level and change in the rate of Service Tax – EQ Mag Pro
- Petition of PPA executed between NTPC Limited and UPCL, seeking compensation due to increase in costs on account of change in rates of Goods and Service Tax – EQ Mag Pro