![Petition for seeking permission to continue interchange of infirm power including drawal of start-up power from the Grid as per Deviation Settlement Mechanism – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for seeking permission to continue interchange of infirm power including drawal of start-up power from the Grid as per Deviation Settlement Mechanism – EQ Mag Pro
0
0
Petition for seeking permission to continue interchange of infirm power including drawal of start-up power from the Grid as per Deviation Settlement Mechanism.
For more information please see below link:
Related posts:
- Petition of PPA executed between UHBVNL and Adani Power Limited – EQ Mag Pro
- Petition for adoption of tariff for the Procurement of Aggregated Power of 2500 MW under Pilot Scheme-II for three years as notified by Government of India – EQ Mag Pro
- Petition for claiming for compensation due to levy of charges of transportation of fly ash as per the terms of PPA executed between the Petitioner and the Respondent – EQ Mag Pro
- Petition for determination of tariff of combined cycle gas based Palatana Power Project of ONGC Tripura Power Company Limited (726.6 MW) for the 2019-24 tariff period OTPC Limited – EQ Mag Pro