Petition for seeking relaxation of the procedure set out of Detailed Procedure for “Grant of Connectivity to Projects Based on Renewable Sources to Inter-State Transmission System” – EQ Mag Pro
0
0
Petition for seeking relaxation of the procedure set out of Detailed Procedure for “Grant of Connectivity to Projects Based on Renewable Sources to Inter-State Transmission System”.
For more information please see below link:
Related posts:
- Petition for connectivity to the ISTS (inter-State transmission system) for a quantum of 500 MW, as a “bulk consumer” located at Moti Khavdi, Jamnagar, Gujarat – EQ Mag Pro
- Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant – EQ Mag Pro
- Petition for seeking declaration that the Transmission Agreement for Connectivity Transmission Service Agreement and Agreement for Long Term Access executed between ReNew Wind Energy (TN) Pvt. Ltd. and Power Grid Corporation of India Limited – EQ Mag Pro
- Petition for adoption of tariff for 8800 MW Solar Power Plants connected to InterState Transmission System (ISTS) linked with Setting up of 2200 MW Solar Manufacturing Plant, selected through Competitive Bidding Process – EQ Mag Pro