Petition for the adoption of tariff for the cumulative capacity of 18 MW Ground Mounted Solar Photo Voltaic (PV) Project connected to BBMB inter-state transmission system – EQ
0
0
Petition for the adoption of tariff for the cumulative capacity of 18 MW Ground Mounted Solar Photo Voltaic (PV) Project connected to BBMB inter-state transmission system
For more information please see below link:
Related posts:
- Petition for adoption of tariff for the cumulative capacity of 18 MW Ground Mounted Solar Photo Voltaic (PV) Project connected to BBMB inter-state transmission system – EQ
- Petition for approval of tariff of Ratnagiri Power Station (1967.08 MW) for the period from 1.4.2019 to 31.3.2024 Ratnagiri Gas and Power Private Limited – EQ Mag Pro
- Petition for determination of transmission tariff for 2019-24 tariff period in respect of five number of assets under “North-Eastern Region Strengthening Scheme-VIII” PGCIL – EQ Mag
- Petition for seeking appointment of Arbitrator for resolution of disputes between Tata Power Delhi Distribution Limited and THDC Limited – EQ Mag