Petition for True-Up for FY 2019-20, Annual Performance Review for FY 2020-21 and Tariff Determination for FY 2021-22 for Goindwal Sahib Thermal Power Plant of 2×270 MW at Goindwal Sahib – EQ Mag Pro
0
0
Petition for True-Up for FY 2019-20, Annual Performance Review for FY 2020-21 and Tariff Determination for FY 2021-22 for Goindwal Sahib Thermal Power Plant of 2×270 MW at Goindwal Sahib.
For more information please see below link:
Related posts:
- Petition for True-Up for FY 2019-20, Annual Performance Review for FY 2020-21 and Tariff Determination for FY 2021-22 for Goindwal Sahib Thermal Power Plant – EQ Mag Pro
- Petition For seeking approval of procurement of 300 MW Solar Power on Long Term basis under the Power Sale Agreement entered into between PSPCL and NHPCL – EQ Mag Pro
- Petition of General Conditions of Tariff contained in tariff order for the year 2020- 21 and similar condition(s) in the tariff orders for the year 2019- 20 passed by the Commission – EQ Mag Pro
- Petition for the approval of Revised scope/cost of the works already approved in MYT 2020-23 and for the Inclusion of new works of urgent nature as capital works in the MYT Control period FY 2020-21 to FY 2022-23 – EQ Mag Pro
tags:
Annual Performance Review Goindwal Sahib Thermal Power Plant Petition PSERC Tariff Determination