Petition for truing up of annual fixed charges for the 2014-19 tariff period and for determination of tariff for the 2019-24 period in respect of the Indira Sagar Hydroelectric Project (1000 MW) – EQ Mag Pro
0
0
Petition for truing up of annual fixed charges for the 2014-19 tariff period and for determination of tariff for the 2019-24 period in respect of the Indira Sagar Hydroelectric Project (1000 MW).
For more information please see below link:
Related posts:
- PGCIL has filed the instant petition for truing up of the capital expenditure of the 2014-19 tariff period and for determination of transmission tariff for the period from 1.4.2019 to 31.3.2024 under the CERC – EQ Mag Pro
- Petition for approval of tariff of Ramagundam Super Thermal Power Station Stage-III (500 MW) – EQ Mag Pro
- Petition for adoption of tariff discovered through Competitive Bidding Process for procurement of power from 190 MW Grid Connected Solar PV Power Project at Nokh Solar Park – EQ Mag Pro
- Petition for determination of tariff of the generating stations operated and managed by BBMB for the 2019-24 tariff period – EQ Mag Pro