Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Badarpur Thermal Power Station (705 MW). NTPC Limited – EQ Mag Pro
0
0
Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Badarpur Thermal Power Station (705 MW). NTPC Limited.
For more information please see below link:
Related posts:
- Petition For Approval of the Tariff of Bongaigaon Thermal Power Station (750 MW) For the Period From COD of Unit-1
- Petition for adoption of usage charges for 1,692 MW Solar Photovoltaic (PV) Power Station (Tranche-I & II) connected to the inter-State Transmission System and selected through competitive bidding process under‘ CPSU Scheme Phase-II – EQ Mag Pro
- Petition for revision of tariff of Vindhyachal Super Thermal Power Station, Stage-I (1260 MW) for the period from 1.4.2014 to 31.3.2019 – EQ Mag Pro
- Petition of PPA for a declaration that the imposition of safeguard duty by the Ministry of Finance vide its Safeguard Notification is a change in law‟ event – EQ Mag Pro