![Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Feroze Gandhi Unchahar Thermal Power Station Stage-III (210 MW) – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Feroze Gandhi Unchahar Thermal Power Station Stage-III (210 MW) – EQ Mag Pro
0
0
Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Feroze Gandhi Unchahar Thermal Power Station Stage-III (210 MW).
For more information please see below link:
Related posts:
- Petition for revision of tariff of Ramagundam Super Thermal Power Station Stage-III (500 MW) – EQ Mag Pro
- Petition in connection with the disputes and differences arising due to breach of PPA entered between it and Nuclear Power Corporation of India Limited – EQ Mag Pro
- Petition for non-operationalization of 150 MW out of the total 350 MW, on the premise of the start date of LTA – EQ Mag Pro
- Petition for determination of tariff in respect of the Bairasiul Power Station (180 MW). NHPC India Limited (NHPC) – EQ Mag Pro