![Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Korba STPS Stage-III (500 MW). NTPC Limited – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Korba STPS Stage-III (500 MW). NTPC Limited – EQ Mag Pro
0
0
Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Korba STPS Stage-III (500 MW). NTPC Limited.
For more information please see below link:
Related posts:
- Petition For Truing Up of Tariff For 2014-19 And Determination of Tariff For 2019-24 of Dulhasti Hydroelectric Power Station (390 MW)
- Petition For Truing Up of Transmission Tariff of 2014-19 And Determination of Transmission Tariff of 2019-24 For One No. of Asset in Western Region
- Petition for recovery of Additional Expenditure incurred due to ash transportation charges consequent to Ministry of Environment, Forest & Climate Change, Government of India – EQ Mag Pro
- Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected through inter-State Transmission System – EQ Mag Pro