![Petition for truing-up of tariff of Circulating Fluidized Bed Combustion Technology based NLC Thermal Power Station-II Expansion Units I & II (500 MW) – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for truing-up of tariff of Circulating Fluidized Bed Combustion Technology based NLC Thermal Power Station-II Expansion Units I & II (500 MW) – EQ Mag Pro
0
0
Petition for truing-up of tariff of Circulating Fluidized Bed Combustion Technology based NLC Thermal Power Station-II Expansion Units I & II (500 MW).
For more information please see below link:
Related posts:
- Petition Seeking directions in respect of an alleged LTOA of 216 MW granted to PTC India Limited for Merchant Trading of power from 1200 MW Teesta-III Hydroelectric Project – EQ Mag Pro
- Petition for amendment of PPAs to align them with Regulation 15 of the RERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations – EQ Mag Pro
- Petition of PPA entered into between Sembcorp Energy India Limited & the distribution licensees of States of Andhra Pradesh and Telangana, seeking compensation on account of the Change in Law event – EQ Mag Pro
- Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected to Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro