![Petition for truing-up of tariff of combined cycle gas based Palatana Power Project of ONGC Tripura Power Company Limited (726.6 MW) for the 2014-19 tariff period – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for truing-up of tariff of combined cycle gas based Palatana Power Project of ONGC Tripura Power Company Limited (726.6 MW) for the 2014-19 tariff period – EQ Mag Pro
0
0
Petition for truing-up of tariff of combined cycle gas based Palatana Power Project of ONGC Tripura Power Company Limited (726.6 MW) for the 2014-19 tariff period.
For more information please see below link:
Related posts:
- CERC Adopted Individual Tariff for 3 GW of the Power Projects
- Petition For Approval of the Tariff of Bongaigaon Thermal Power Station (750 MW) For the Period From COD of Unit-1
- Petition For Revision of Tariff of Feroze Gandhi Unchahar Thermal Power Station, Stage-II (420 MW) For the 2014-19 Tariff Period – EQ Mag Pro
- Petition for adoption of tariff discovered through competitive bidding process for procurement of power from 190 MW grid-connected Solar PV Power Projects at Nokh Solar Park – EQ Mag Pro