Petition for truing-up of tariff of Kahalgaon Super Thermal Power Station, Stage-I (840 MW) for the period 2014-19. NTPC
For more information please see below link:
Related posts:
- Petition For Adoption of Tariff For Inter-State Transmission System Connected 1200 MW
- Petition For Truing Up of Tariff For 2014-19 And Determination of Tariff For 2019-24 of Dulhasti Hydroelectric Power Station (390 MW)
- Petition for truing up of annual fixed charges for the 2014-19 tariff period and for determination of tariff for the 2019-24 period in respect of the Indira Sagar Hydroelectric Project (1000 MW) – EQ Mag Pro