![Petition for truing up of transmission tariff for 2014-19 tariff period and determination of transmission tariff of 2019-24 period for one number of asset – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for truing up of transmission tariff for 2014-19 tariff period and determination of transmission tariff of 2019-24 period for one number of asset – EQ Mag Pro
0
0
Petition for truing up of transmission tariff for 2014-19 tariff period and determination of transmission tariff of 2019-24 period for one number of asset under “Eastern Region Strengthening Scheme–VIII” in Eastern Region
For more information please see below link:
Related posts:
- Petition For Truing up of Transmission Tariff of 2014-19 And Determination of Transmission Tariff of 2019-24 For 21 Assets
- Petition For Truing Up of Transmission Tariff of 2014-19 And Determination of Transmission Tariff of 2019-24 For Two Number of Combined Assets
- Petition For Truing Up of Transmission Tariff of 2014-19 And Determination of Transmission Tariff of 2019-24 For Three No. of Assets Under “NLC-I Transmission System in Southern Region”
- Maithon Power Limited, Has Filed the Present Petition Against the Unilateral Surrender of 150 MW of Power Supplied
tags:
CERC determination of transmission tariff of 2019-24 Eastern Region Petition truing up of transmission tariff for 2014-19 tariff period